The comparison between the third and the sixth line of the wind pipe production line is introduced below. I hope you can have a better understanding of the knowledge through our introduction. Let's have a detailed introduction below.
First, the third line of the wind pipe production is composed of the feeding rack, the leveling reinforcement machine, the punching tip mouth and the punching square mouth machine and the shearing machine. The electrical control part is controlled by the whole computer. The control system has closed loop feedback system, and the production accuracy and stability are obviously improved. The maximum working speed is 12 meters par minute, and the charging rack can be completed according to the requirements of customers.
Second, the sixth line of the wind pipe production line adopts the U-linear structure, and has achieved a new breakthrough made on the basis of the fifth line of the wind pipe. The functions of the sixth line of the wind pipe production line are as follows:
1. the common plate flange pipe and angle steel flange air pipe can be processed on the same production line. The daily production is 1000-2500 square metre. The computer is easy to operate. People only need to input the desired duct size into the computer program, and the computer will automatically arrange and cut down the material.
2. the computer control system and the mechanical separation mode enhanced the stability performance without interference.
3. wind pipe automatically completes the opening and the leveling pressure angle joint and the joint plate flange forming angle steel flange are formed.
I hope the distinguished introduction between the third and sixth line of wind pipe production line can help you understand better and have more knowledge about this area. We will continue to bring it to you, please look forward to it.
Related News
July 30, 2018The hand folding machine should judge its precision from the precise position it has achieved. Therefore, the precision of the hand folding machine should be carefully checked. The precision of the ha...view
April 18, 20181. When the machine stops working, the system works, the cutting gun moves in one direction or not, and pressing any key (especially the pause button) doesn't work, it maybe the machine is jammed.Remo...view
July 30, 2018We all know that the production and processing of air duct need to be done through the auto duct processing equipment. The auto duct line is widely used now, it is a kind of integrated and systematic ...view
July 30, 2018There will be some abnormal situation when a lot of mechanical equipment in use, the hand folding machine cannot work properly, what factors are responsible for this?Hand folding machine is prone to w...view
July 25, 2019The duct beader machine is roughly divided into CNC duct beader machine, hydraulic duct beader machine and so on. It is used in pipeline laying and repair of the electric power construction, railway c...view
July 30, 2018Structure of the Composition of Auto Duct Line of Nip MachineThe biting machine, also known as reel bone machine, the bite sewing machine, the undercutting machine, the air duct line, the air duct ree...view